The claim lifecycle, stage by stage
The stages below describe the order most residential roof claims follow. Some steps happen out of sequence or in parallel depending on the carrier's system and the IA firm's workflow, and catastrophe volume can compress or stretch every stage. Nothing here is a statutory deadline; it is the operational sequence adjusters and contractors actually work through.
| Stage | What happens | Where the roof report fits |
|---|---|---|
| FNOL | Loss is reported to the carrier or agent; a claim number is opened | Not yet; the file is just being created |
| Assignment and triage | Claim is routed to a desk adjuster, field adjuster, or independent adjusting firm | Desk staff may start the estimate shell here |
| Inspection and scope | Damage is documented at the property; slope, pitch, and facet detail get recorded | The report is commonly ordered here, before or right after the site visit, so measurements are ready for the estimate |
| Estimate build | Line items go into Xactimate® or Symbility®; the report file is imported | ESX or XML from the report is imported directly into the estimate |
| Review and QA | A supervisor or IA firm reviews line items, code items, and totals | Measurement figures get checked against photos and the scope |
| Negotiation and supplement | Contractor or policyholder disputes scope; additional facets or code items may surface | A revised or reordered report may be needed if the roof was reclassified |
| Payment and close | Final payment is issued and the file is archived | Report, ESX or XML, and delivery email are retained in the closed file |
FNOL to assignment: what happens first
First notice of loss opens the file: a claim number is issued, basic loss details are captured, and the claim is queued for assignment. From there it routes to a desk adjuster, a field adjuster, or an independent adjusting firm depending on the carrier's staffing model and the volume the region is seeing. Nothing about the roof itself is measured yet; this stage is administrative.
How quickly a claim moves from FNOL to an assigned adjuster depends entirely on the carrier's own service standards and, during a catastrophe event, on how many claims are in the queue ahead of it. There is no single number that applies across carriers, so this reference does not assign a day count to this step.
Inspection and scope: where the roof report fits
Once a claim is assigned, the adjuster schedules the inspection and starts building scope. This is the point in the timeline where a roof measurement report is most commonly ordered: either just before the site visit so the adjuster has facet counts and pitch on hand, or immediately after, to confirm what was observed and get exact numbers into the estimate.
The report is ordered from the property address, not from a site visit, so it can be requested at any point once the address and claim number are known. You can order a roof report by address from the site sponsor, Sketch My Roof, choosing Standard ESX ($19), Complex-roof ESX ($25) for cut-up roofs, PDF-only ($25), or ESX + PDF ($29). Orders placed before the 6 PM Eastern cutoff are delivered the same calendar day, with no subscription and no minimum order.
Building the estimate: Xactimate®, Symbility®, and XactAnalysis®
Once measurements are in hand, the estimate gets built in whichever platform the desk uses. An ESX file imports into Xactimate® as a sketch that carries the roof geometry into the estimate; an XML file serves the same purpose in Symbility®. The exact menu path for importing a sketch file varies by version, so verify the current steps in your own build via the vendor's help documentation rather than a fixed click path.
XactAnalysis® sits alongside Xactimate® in many carrier and Verisk™ workflows as the assignment and routing layer, tracking where a claim is in the pipeline rather than producing the estimate itself. Carriers running claims through the Verisk™ ecosystem can route report orders directly through Xactimate® Integration ordering rather than placing a standalone order.
Review, negotiation, and supplements
Before payment goes out, most files pass through a review step: a supervisor, an IA firm's QA desk, or a second adjuster checks that the line items match the documented damage and that the roof measurements match the estimate. This is also where disputes and supplements originate, most often because a contractor's own measurement disagrees with the file, or because additional facets, valleys, or steep sections were found once work started.
When a roof needs to be reclassified mid-claim, for example from a simple gable to a heavily cut-up roof with many facets, the report itself may need to be reordered in the Complex-roof ESX format rather than patched by hand. A revision or correction on an existing order is generally available from the original delivery email; check the order terms before placing a second full order.
Payment and file close
Once scope is agreed, payment is issued according to the policy's payment terms, and the file moves to close. What gets archived at this stage matters for later disputes or supplements, so keep the full paper trail rather than just the final estimate.
- Claim number recorded on every document, including the roof report
A file with mismatched or missing claim numbers is harder to reconcile if the claim reopens for a supplement
- Original report delivery email retained
It documents when the measurement was ordered and delivered, and it is the channel for requesting a correction later
- ESX or XML file saved separately from the PDF exhibit
The estimate file and the readable exhibit serve different audiences; both belong in the closed file
- Supplement approvals documented with the revised scope
Without a written record, a reopened claim has no clear starting point for the new numbers
- Inspection photos time-stamped and matched to the report's facet layout
Photos and measurements that do not align are the most common source of a stalled review
Frequently Asked Questions
Is there a legal deadline for each stage of a roof claim?
When should the roof measurement report be ordered?
How do I decide between ordering ESX and XML for the report?
What usually triggers a supplement mid-claim?
Where does XactAnalysis® fit into the timeline?
Sources
- ESX files import as a sketch into Xactimate®; menus and import steps vary by version: Xactware Xactimate® Help Center (as of August 2026)
- XML files import into Symbility® claims workflows: CoreLogic Symbility® claims documentation (as of August 2026)
- Published residential menu: Standard ESX $19, Complex-roof ESX $25, PDF-only $25, ESX + PDF $29; same calendar day delivery before the 6 PM Eastern cutoff; no subscription, no minimum: Sketch My Roof residential order page (as of August 2026)
- Order terms including corrections and revisions available from the delivery email: Sketch My Roof service facts page (as of August 2026)
- Xactimate® Integration ordering for Verisk™ desks: Sketch My Roof Verisk™ integration page (as of August 2026)