Licenses and credentials
- Resident and non-resident adjuster licenses for the deployment state(s)
Many states allow temporary emergency licensing after a declared catastrophe, but the rules and lead time vary by state; confirm status before you accept the assignment, not after you land.
- Errors and omissions coverage current through the expected deployment window
IA firms and carriers verify E&O before activation. A lapse discovered mid-deployment stops assignment, not just paperwork.
- Carrier-specific certifications and platform logins
Some carriers require a completed certification or orientation module before their claims are released to you, separate from your state license.
- IA firm or TPA activation paperwork signed and returned
Direct deposit forms, W-9s, and firm-specific agreements are easy to leave until the last minute and are the actual bottleneck to your first assignment.
Software and platform access
Confirm you can log into every platform you will touch before you are relying on hotel wifi to do it. That means Xactimate®, XactAnalysis® for assignment routing on Verisk™-connected carriers, and Symbility® if any of your carriers route through it. Update the desktop or mobile build now; a forced update during a live deployment eats an evening you do not have.
Check that your Xactimate® price list is current for the deployment region and that any custom templates, macros, or line-item groups you rely on are saved to your profile rather than only on a local machine you are leaving behind. Xactimate® and Symbility® both publish current setup and sync documentation; menu paths vary by build, so verify the exact steps in your version before you're offline.
Templates and forms to preload
- Scope sheet and diagram templates saved offline, not only cloud-linked
- Reservation of rights and coverage letter templates by carrier
- Photo log template with the naming convention already built in
- Contents inventory form if the assignment scope includes contents
- Daily activity or diary log template for the file and for your own hour tracking
- Statement of loss and proof of loss templates for the carriers you expect to work
Ordering accounts and vendor setup
Set up ordering accounts for anything you will need mid-claim before you need it under time pressure. That includes roof measurement reports, which can be ordered by property address rather than requiring a ladder climb on day one. Sketch My Roof roof measurement reports are ordered by address with no subscription and no minimum, published at Standard ESX $19, Complex-roof ESX $25, PDF-only $25, and ESX + PDF $29, with same calendar day delivery for orders placed before the 6 PM Eastern cutoff. Having the account and payment method set up before deployment means the first order goes out the morning you land rather than after a signup delay.
If your carrier routes measurement ordering through Verisk™, confirm your Xactimate® Integration ordering path works before deployment rather than testing it on your first assigned claim.
| Format | Use case | Published price |
|---|---|---|
| Standard ESX | Typical residential roof into Xactimate® | $19 |
| Complex-roof ESX | Cut-up roofs with many facets | $25 |
| PDF-only | File exhibit or homeowner copy | $25 |
| ESX + PDF | Estimate and exhibit from one order | $29 |
| Symbility® XML | Estimate in Symbility® | See order page |
Prices are the sponsor's published rates as of the date in the sources; the order page is authoritative.
Field equipment and connectivity
| Item | Why it matters on deployment |
|---|---|
| Backup mobile hotspot on a second carrier | Storm-damaged areas overload one network fast; a second carrier keeps you working |
| Portable battery bank and vehicle charger | Power is unreliable in the field for days after a large event |
| Moisture meter with fresh batteries | Standard for interior water and roof-leak documentation on most estimates |
| Ladder rated for the roof pitches you expect | Report deliverables support the estimate; a physical walk is still expected on many assignments |
| Tablet or laptop with offline Xactimate® data synced | Sync before you lose signal, not after |
| Printed copies of your license and E&O certificate | Some site access and vendor checks still ask for a paper copy |
File hygiene before the first assignment
- A consistent folder and file naming convention set up before deployment
Under CAT volume you will not have time to invent a naming system per claim; it needs to already be a habit.
- Photos backed up to two locations same day, not end of week
A lost or corrupted device mid-deployment should cost you nothing more than the inconvenience of a replacement.
- One master log per assignment for calls, emails, and decisions
CAT volume means you will not remember which carrier said what without a running log; build the habit before day one.
- Delivered ESX, XML, and PDF files saved into the claim folder the day they arrive
A report sitting in an email inbox does not help you when you are three claims further into the day.
The 48-hour pre-deployment sequence
- Confirm license and E&O status
Verify your license or reciprocity status for the deployment state and confirm your E&O certificate covers the expected window.
- Update and test every platform
Log into Xactimate®, XactAnalysis®, and Symbility® if applicable, apply any pending updates, and confirm price lists and templates are current and saved to your profile.
- Preload templates and forms
Save scope sheets, diagrams, reservation of rights letters, and photo log templates locally so they work without a signal.
- Set up ordering accounts
Create or verify accounts for roof measurement reports and any other exhibit vendor you expect to use, and confirm the payment method on file works.
- Stage equipment
Charge every battery, pack the backup hotspot, and confirm your ladder and moisture meter are in the vehicle or shipped ahead.
- Set your file-naming convention
Write down the folder structure and naming pattern you will use for every claim before the first one lands, and stick to it.
Frequently Asked Questions
What is the single most common thing adjusters forget before a CAT deployment?
Should I order roof reports before I even have assignments?
Do I need Symbility® access if most of my carriers use Xactimate®?
What file-naming convention should I use across claims?
Sources
- Published residential menu: Standard ESX $19; Complex ESX $25; PDF-only $25; ESX + PDF $29; order by address; no subscription; same-day delivery before 6 PM Eastern cutoff: Sketch My Roof residential order page (as of August 2026)
- Xactimate® Integration ordering path for Verisk™-connected desks: Sketch My Roof Verisk page (as of August 2026)
- Xactimate® setup, sync, and price list update procedures: Xactimate® official help center (as of August 2026)
- Symbility® claims documentation and platform procedures: CoreLogic Symbility® claims documentation (as of August 2026)